A future growth precinct — City of Melton (long-term planning)

Future plans

A precinct planned for the long term.

Bulmans Road sits in Horizon 3 of Victoria's 10-year plan for Melbourne's greenfields — planning is expected to commence between 2029/30 and 2033/34. The deliverables below reflect how greenfield precincts of this scale are normally planned; the binding figures will come from the future precinct structure plan.

New homes

Dwelling yield and density will be set by the future precinct structure plan. No figures have been gazetted.

Local town centre

Greenfield precincts of this scale typically include a local town centre — location and scale subject to the PSP.

School sites

Government and non-government school sites are usually reserved within precinct structure plans. Sites TBC.

Conservation

Any conservation area will be identified in the official plan alongside biodiversity assessment.

Open space & green spine

A connected open-space network typically follows existing waterways and drainage corridors.

Future residents

Population capacity follows dwelling yield — to be set by the future precinct structure plan.

Indicative delivery timeline

  1. Stage 1

    Planning & enabling works

    Precinct structure planning, infrastructure contributions, servicing and road upgrades.

  2. Stage 2

    First homes

    Initial land releases and early residential construction closest to existing services.

  3. Stage 3

    Town centre & schools

    Local retail, community facilities and the first school sites come online as population builds.

  4. Stage 4

    Maturing community

    Open-space network completed, later stages delivered, precinct reaches planned capacity.

Indicative staging only — sequencing and timing are not yet programmed.

Artist's impression of the future local town centre serving Bulmans Road
Artist's impression — indicative only.

The official plan

Straight from the source.

View the official planning source

Victoria's 10-year greenfields plan (Planning Victoria)

The final PSP document will be published by the VPA at gazettal — follow progress on the official page.

Official status

FUTURE PRECINCT — unprogrammed; Horizon 3 of Victoria's 10-year greenfields plan (plans to commence 2029/30–2033/34). 214.8 ha immediately north-west of Melton township at Harkness. No VPA project page or PSP document yet.

PSP documents are published by the Victorian Planning Authority. HALP links to the official source and does not host or alter them.

Source: Victorian Planning Authority — Bulmans Road PSP (PSP 1205).